Turnkey Process Description
Click on the links below to view illustrations/images of stages within the turn-key process:
- FEM Calculation
- 3D model
- A33 katos 011 manufacture
- Montage of images of finished product/glass roof
Turn-key process description
- Technical expertise and complete project management
- Required drawings
- FEM strength calculations
- 3D designs
- Required certifications (e.g. fire resistant certification)
- Specification of the right glass for each product/structure (e.g. energy saving glass, coloured glass etc.)
- Manufacture of the aluminium and steel frames
- Material purchases of all other necessary materials
- Selection of the correct sealants and preparation of all the required fittings
- Installation work on board ships/cruise vessels