The Early Childhood Development and Parenting Center has been designed to make optimum use of natural light and overall energy use is 25 percent less than in a typically constructed building.  More than 20 percent of building materials in the 47,885 sq ft structure are made from recycled material.

 

Around 9,000 sq ft of Pilkington Eclipse Advantage™ Arctic Blue over Pilkington Energy Advantage™ was used for the insulating glass units at the Center, which is built around a central courtyard and features an all-glass façade.

 

The Harris Stowe project achieved LEED gold certification from the USGBC.



Reference
usa68

Launch Date
2009

Location

Address
Harris Stowe Childcare & Academic Facility 3026 Laclede Ave, St Louis, Missouri‎

Metres
9,000 sq ft

Architect

KAI Design Build

St. Louis, MO



Client
Harris Stowe University

Accredited Installer

Fabricator -
Oldcastle Warrenton

Sold by Bob Syroka, Syroka Assocs